Welcome to our websites!
699pic_115i1k_xy-(1)

T slot aluminium extrusion silver anodized aluminum

T slot aluminium extrusion silver anodized aluminum

Short Description:

Quality Standard

GB/T6892-2008,GB/T5237-2008

Material

6061,6063.6005,7075

Out Diameter

8-180mm

Wall Thickness

0.5-150mm

Length

0.08m~6m or customer required

Surface Treatment

Anodizing


Product Detail

Product Tags

Jiangsu Xingyong Aluminium Technology Co., Ltd.have the whole produce processing for the aluminum square hollow tube. When customer provide us sample or drawing, we will make production drawing for our customer, when customer confirm it, we build mold and then produce sample, after sample confirmed, we make mass production.

The main features of 6000 series, 7000 series aluminum tubes are: high weather resistance anti-scratch corrosion resistance and good weather resistance subtle edge and elegant appearance and easy processing and installation high brightness and hardness. So it can be used as tent pole.

We specialize in aluminum tent poles and tent accessories, you can choose different sizes of tent poles with high quality and reasonable price.

Aluminum tubing is a non-ferrous metal tube, which is a hollow metallic tubular material along its longitudinal direction, made from pure aluminum or aluminum alloy by extrusion processing.

It can have one or more closed through-holes, has uniform wall thickness and cross-section, and is delivered in straight lines or in rolls. It is widely used in the automotive, marine, aerospace, aviation, electrical, agricultural, electromechanical and household appliance industries.

Mould:

1. Customer can choose public mould

2. Build new mould according to customer's drawing or sample,mould fee will be return back when order reach to 20 tons.

3. Mould development need around 7 days

Price:

Aluminium Ingot price + processing cost

Minimum Order Quantity:

each mould 300kg

Delivery time:

20 days for mass production

Normal order sequence:

1. Confirm production drawings, order details.

2. Start to build mold when receive mold fee.

3.Send free sample to customer

4.Customer confirm sample

5. Start production when receive 30% deposit

6. Arrange Balance

7. Delivery


  • Previous:
  • Next: