Welcome to our websites!
699pic_115i1k_xy-(1)

Extendable mop pole swiffer sweeper pole

Extendable mop pole swiffer sweeper pole

Short Description:

Material:

Aluminum Alloy

Alloy Temper:

6063-T5

Hardness:

35-160HB

Shape:

Round

Surface Treatment:

Anodized

anodizing film

Standard 8-10 um, or custom


Product Detail

Product Tags

telescopic pole 2

We specialize in aluminum tent poles and tent accessories, you can choose different sizes of tent poles with high quality and reasonable price.

The advantageous properties of aluminum alloys are light weight, good electrical and thermal conductivity, corrosion resistance, and good ductility. Aluminum alloys are soft and are often alloyed with copper, zinc, magnesium, silicon, manganese and lithium for added strength. Aluminum alloys are oxidized with an antioxidant film on the surface to prevent oxidation by air when the aluminum alloy is exposed to air.

Aluminum alloys are among the lightest metals available. Products are used in applications ranging from precision technology to everyday goods.

Global Market

package

We are committed to developing international markets. Our customers come from all over the world, such as South Africa, Latin America, Europe, etc. Our high quality and low price products have won their recognition.

Key features of aluminum

product process map

High weather resistance Scratch resistance Corrosion resistance and good weather resistance Subtle edges and elegant appearance, easy to process and install

Processing and installation with high brightness and hardness Therefore, it is widely used in aluminum windows, doors, curtain walls, handrails, railings. General aluminum profiles, decorative and industrial aluminum profiles, etc.

factory information

Mould:

1. Customer can choose public mould

2. Build new mould according to customer's drawing or sample,mould fee will be return back when order reach to 20 tons.

3. Mould development need around 7 days

Price:

Aluminium Ingot price + processing cost

Minimum Order Quantity:

each mould 300kg

Delivery time:

20 days for mass production

Normal order sequence:

1. Confirm production drawings, order details.

2. Start to build mold when receive mold fee.

3.Send free sample to customer

4.Customer confirm sample

5. Start production when receive 30% deposit

6. Arrange Balance

7. Delivery

Brand Name:

xing yong lv Ye

Certificate:

ISO 9001:2015,ISO/TS 16949:2016

Quality Standard

GB/T6892-2008,GB/T5237-2008

certificate

 

 


  • Previous:
  • Next: